HOME      NEWS      OVERVIEW     INVEST GUIDE    ABOUT US
 
 choose langue
search   
 HOME > OVERVIEW > NATURAL CONDITIONS > HYDROLOGY
 Brief introduction
 Natural Conditions
      Land forms
      Climate
      Hydrology
 Area Planning
      Geographical location
      Planning
 A Survey of Zhenjiang
 In The Zone Enterprise
 

The Changjiang River is the major source of surface water in Zhenjiang New Area. The water system belongs to tidal reach. The tide rises and falls twice a day with an average time-lapse of 3 hours and 25 minutes.

1 Water level and tidal range
 Highest flood stage in history: 6.69m(Huanghai height, the same  below)
 (recorded in 1996)
 Lowest water level: -0.65m
 Average flood stage: 5.20m
 Average low water level: 0.06m
 Maximum tidal range in history: 2.10m
 Minimum tidal range in history: 0.01m
 Average tidal level: 0.96m
2 Current velocity
 Maximum velocity: 2.00m/s ( flood period)
 Minimum velocity: 0.50m/s (drought period)
 Average velocity: 1.00m/s (medium water level)
3 Rate of flow
 Maximum peak discharge: 92600m /s3 ( recorded on August 1, 1954 )
 Maximum average rate of flow: 43100m 3 /s (1954)
 Average rate of flow over the years: 28600m 3 /s
 Minimum average rate of flow: 21400m 3 /s
 Minimum rate of flow in drought period: 4620m 3 /s
 Average annual runoff: 893.3 billion m 3

 
 
Copyright 2003--2004 Zhenjiang New Area Administrative Committee
ADD: No.98 Jinang Avenue, Dagang, Zhenjiang, Jiangsu, China     POSTCODE: 212132
TEL: +86-511-337-1023,337-2276,317-1700,317-6066
FAX: +86-511-337-1206,337-2275,317-6767,317-1966